If you are submitting all the details of new buildings, engineering works or extensions, the following additional plans will be required:
| 4 copies of the site plan of the site to a scale of not less than 1:500 |
|
| 4 copies of the existing and proposed elevations to a scale of not less than 1:100 |
|
| 4 copies of existing and proposed sections and finished floor levels at a scale of not less than 1:100 |
|
| 4 copies of existing and proposed floor plans at a scale of not less than 1:100 |
|
| 4 copies of a site survey plan to a scale of not less than 1:200 showing existing features of the site e.g. walls, trees, buildings and other structures |
|
| 4 copies of a site survey plan at a scale of not less than 1:200 showing proposed features e.g. landscaping |
|
| Supporting Planning Statement |
|
In addition to the information that MUST be submitted with your application, the following information may also be required:
| Details of proposed materials |
|
| Street-scene elevations |
|
| Environmental Statement |
|
| Design Statement |
|
| Access Statement |
|
| Transport Assessment |
|
| Draft Travel Plan |
|
| Cycle Store details |
|
| Listed Building Appraisal |
|
| Conservation Area Appraisal |
|
| Aboricultural impact appraisal |
|
| Aboricultural method statement |
|
| Nature conservation and Ecological Assessment |
|
| Historical and Archaeological Assessment |
|
| Noise impact assessment |
|
| Air quality assessment |
|
| Assessment for the treatment of foul sewage |
|
| Utilities Statement |
|
| Energy Statement |
|
| Sound Insulation Assessment |
|
| Sunlight/Daylighting Assessment |
|
| Ventilation and extraction details |
|
| Refuse disposal details |
|
| Structural Survey |
|
| Details of lighting scheme/Lighting Assessment |
|
| Flood Risk Assessment/Drainage Strategy |
|
| Details of Sustainable Urban Drainage Systems (SUDS) |
|
| Photographs and photomontages |
|
| Contaminated Land Assessment |
|
| Tourism Validity Report |
|
| Justification statement for the loss of playing fields and major sporting facilities |
|
| Sustainability Appraisal |
|
| Aerodrome safeguarding assessment |
|
| Open Space (or method of payment for contribution: Section 106/ unilateral undertaking/direct payment) |
|
| Heathland Mitigation Strategy Contribution |
|
| Planning Obligation(s)/Draft Heads of Terms |
|
| Affordable Housing Statement |
|
| Retail Impact Assessment |
|
| Employment/Regeneration Statement |
|
| Land Stability Report |
|